Technical support of the client during the wind farm’s development phase
Subsoil and foundation constructions
Transformer platform
Risk management and interface management
Health, safety and environment (HSE) management
Project management
The Global Tech I offshore wind farm covers an area of 41 km2, and is located 100 km north of the North Sea island of Juist, within Germany’s exclusive economic zone. On the wind farm, 80 wind turbines of the 5 MW class were erected, with a total output of 400 MW. The average depth of water in the area is 40 m. Steel tripod foundations were provided for the wind turbines, and the transformer platform was placed on a floating, self-righting construction. Inros Lackner provided consultancy services in relation to geotechnical matters, and took on a number of special project management tasks:
Layout plan: © globaltechone