Several high-tech and low-cost-production shipyards, boatbuilding companies and a public area should be settled.

The aim of the Masterplan / General Project Plan was the development of a basic layout for the settlement of several high-tech and low-cost-production shipyards, boatbuilding, subcontractor and service companies as well as the intergration of a public area with housing construction, harbour promenade and shopping- / Restaurants and Catering business. Following technical plants were designed in line with the infrastructural planning:

  • Harbour basin / marina, inclusive a promenade
  • high-tech and low-cost-production shipyards
  • Roads and ancilliary equipment, including drainage and green area
  • Draining of sewage and rain water
  • Supply of drinking and quench water
  • Energy supply
  • Solar energy plant
  • Wind power station

The rough cost estimation is the basic for cost-benefit-analysis.