Key data

  • Client: Sato Kogyo (Cambodia) Ltd.
  • Planning: 2011, 2013, 2015
  • Construction: 2011-2016
  • Scope of planning:

    Detailed architectural and structural design for 28,000 m2 factory floor for phase 1
    Structural and geotechnical design for phases 2 and 3
    Design of pavements and drainage structures
    Dynamic pile testing for foundations

Minebea Small Motor Factory, Phase 1-3
Phnom Penh Economic Zone, Cambodia

The Minebea Small Motor Factory is located at Phnom Penh Special Economic Zone. It was designed and built in three phases. The production facilities have a total floor area of 80,000 sqm. Inros Lackner Cambodia was engaged by the building contractor for the detailed architectural and structural design and for the design of pavements and drainage works for the 12-hectrar land.