Key data

  • Client: T.S.O. France on behalf of Ministry of Public Work and Transport of Cambodia
  • Construction: 2008-2013
  • Scope of planning:

    Topographic baseline survey of 193km of southern line and 86km of northern lineTrain station surveys in Sihanoukville and PoipetTopographic survey for seven bridgesSetting out for track rehabilitation worksHydraulic study and drainage design

Railway Rehabilitation
Topographic Survey and Survey Management

With financial assistance from the Asian Development Bank, the Ministry of Public Works restored Cambodia's existing railway infrastructure. In 2008 T.S.O France won the contract for the rehabilitation of 600 km of railway track. Inros Lackner Cambodia was subcontracted for the topographic survey of tracks, bridges, train stations and assisted with the design of storm water drainage along the southern railway line.